STC Events
-
Jan
01TENDER NOTICE FOR SUPPLY AND DELIVERY OF ART AND ART BOARD PAPER
Date: Jan/01/2011
-
May
17The 49th Annual General Meeting of the shareholders of the company is scheduled to be held at Tribhuban Army Officer's Club, Bhadrakali, kathmandu, Nepal on 26th Jestha, 2016 (8th June, 2016) on 11PM.
Date: May/17/2016
-
Jan
01TENDER NOTICE FOR SUPPLY AND DELIVERY OF GLAZED NEWSPRINT PAPER
Date: Jan/01/2011
-
May
01FutureWorks Building Solutions
Futureworks Building Solutions Pvt. Ltd. Is a company formed as a joint venture partnership with Pinnacle LLC (USA), Salt Trading Corporation Limited and local entrepreneurs to provide modern construction technology in Nepal.
Date: May/01/2016
-
jul
23STC has started sale of CGI sheets in different branches of the organization, focusing primarily in the earthquake effected areas
Date: jul/23/2014
-
jul
19 -
jul
16Salt Trading Corporation Limited is Revanping Morang Sugar Mills.
Date: jul/16/2012
-
Apr
09 -
Feb
01
FutureWorks Building Solutions
How we build?
Pinnacle Building System Technology (PBST) consists of factory made Light Gauge Steel (LGS) frames combining with Cellular Lightweight Concrete (CLC) and factory made Concrete Tiles.
Our factory made LGS wall structures are transported to the construction site and erected wall by wall on pre-built strip foundation. Concrete Tiles are fixed on either sides of the LGS wall structure using self-drilling screws to act as inner and outer faces of the wall. Subsequently, this wall is filled with Cellular Lightweight Concrete using a special foaming and pumping machine.
We Build
- Residential houses
(multi-storey with flat or sloping roofs)
- Commercial complex up to 8 storey
- Factory/ Warehouses
(Continuous span of 15 meters)
- Schools and health posts
- Site offices for hydro and other infrastructure projects
Benefits
1. SESMIC SAFETY
Light Gauge Steel (LGS) buildings are lighter than traditional buildings therefore, during earthquake less forces are exerted on the structure. Additionally steel is a ductile material, which is adept at absorbing tensile stress, thereby providing stability to the whole structure.
2. SPEED, COST AND PORTABILITY
As the frames and concrete tiles are fabricated and assembled in the factory and Cellular Lightweight Concrete (CLC) is pumped using a machine, the overall time for a building is up to 300% faster providing cost benefit. Also, LGS frames are lightweight and can be assembled on site with ease, transporting them to remote sites is much easier than conventional construction materials.
3. ENERGY AND ACOUSTICS
CLC is an excellent insulator, providing up to 300% more insulation than conventional construction. Buildings built with this technology are more energy efficient providing quieter environment.
4. FIRE RESISTANCE
Steel is non-combustible material. Steel with concrete has a higher fire resistance rating than other construction material.
5. DESIGN
Our technology allows for various kinds of designs to be implemented, from warehouses that can have a continuous span up to 15mm to buildings up to 8 storeys.
6. LABOUR
As the frames and tiles are fabricated in the factory, the labour requirement at the site is very minimal compared to traditional construction methods.
7. PRECISION CONSTRUCTION & REDUCED WASTAGE
Since everything is prebuilt precisely using machines all alignments are exact and precise, reducing wastage and eliminating variance during construction adding to the overall quality of the buildings,
8. BETTER PROJECT MANAGEMENT
The build itself is easy to manage as most of the work is pre-planned and pre-designed. The need for complex project management on site is significantly reduced adding to overall speed and cost saving for the project. Since this is mostly dry construction method management of raw materials at the project site is easier and efficient. Beside this we also use state of the art Information Technology for better project management.
Services we provide
- Building design with local and international architects
- Regulatory approvals
- Turnkey construction service
- Partial construction service (foundation, structure and optionally with electric. Plumbing, doors and windows)
- Decentralized energy solutions, waste management solutions and water management solutions.